REMOVAL OF SPENT NUCLEAR FUEL FROM SERBIA. ISSUES, SOLVING, LESSONS LEARNED

Year
2013
Author(s)
S. Komarov - Sosny R&D Company, Russia
A. Ivashchenko - Sosny R&D Company, Russia
A. Samsonov - Sosny R&D Company, Russia
File Attachment
326.pdf974.78 KB
Abstract
The removal of SNF from RA reactor site (PC NFS, Serbia) is the most time-consuming and technically complicated operation under RRRFR Program. The project was organized by IAEA. The most efficient techniques and lessons learned from other projects of the RRRFR Program as well as new unique technical decisions were used. Two big challenges were resolved during implementation of Serbian Project: (1) preparation of damaged fuel located in the packages unsuitable for transport, taking into account insufficient infrastructure of RA reactor site and (2) removal of large amount of fuel in one multimodal shipment through several transit countries. The main attention was paid to safety justification of all activities. All approvals were obtained in Russia, Serbia and transit countries. Special canisters were designed for transportation of specific RA reactor fuel (of small dimensions, unidentifiable, damaged due to corrosion). The canister design was selected to be untight – it was the most expedient decision for that case from safety perspective. The technology and a set of equipment were designed for remote removal of the fuel from the existing package (aluminum barrels and reactor channels) and placing of the fuel into the new canisters. After fabrication and assembling of the equipment theoretical and practical training of the personnel was performed. Fuel repackaging took about 5 months. SNF was transported in TUK-19 and SKODA VPVR/M casks. The baskets of large capacity were designed and fabricated for SKODA VPVR/M casks. Special requirements to drying the packages and composition of gaseous medium inside were justified to ensure fire and explosion safety. Due to the tight schedule of RRRFR Program as well as geographical peculiarities of RA reactor site location all types of transport means were used in this transportation: empty casks were delivered by road and air, SNF was transported by road, rail and sea. This paper contains main stages of project realization, describes accepted technical and organizational decisions.