Movement of Radioactive Material Sellafield Site

Year
2016
Author(s)
Maz Hussein - Sellafield Ltd., United Kingdom.
File Attachment
F3034.pdf1.66 MB
Abstract
The UK nuclear decommissioning priority is to reduce risk and hazard and to deliver the clean-up mission cost effectively. This is particularly relevant at Sellafield where the Legacy Ponds and Silos pose the most significant challenges.The availability of safe packaging for the movement and storage on the Sellafield site is a key enabler to meet the NDA mission for safe interim storage ahead of its subsequent treatment, packaging and final storage to a Geologic Disposal Facility (GDF). There are a significant number of packages and package design types operating on the Sellafield site. Some packages are licensed to the IAEA regulations for safe transport and others comply only with the Sellafield site specific requirements.