Year
1983
Abstract
The nuclear materials control and accountability program in the Oak Ridge Y-12 Plant has been placed on a computerized system identified as DYMCAS (Dynamic Special Nuclear Materials Control and Accountability System). The primary goal of the DYMCAS is to assist in detecting the diversion of special nuclear material (SNM)- Secondly, the system is expected to assure quality inventory reconciliations both under normal and emergency situations. The system has been installed and was placed on active status in April 1982. Since that time numerous problems have surfaced and been resolved; i.e., delays of input, hardware breakdown, and misunderstandings of needs. An explanation of these problems, including examples and alterations that have made the system workable, are presented.