One Approach to Accepting and Transporting Spent Fuel From Early-Generation Reactors with Short Fuel Assemblies

Year
1992
Author(s)
R.W. Peterson - E.J. Bentz & Associates
E.J. Bentz Jr. - E.J Bentz & Associates, Inc.
C.B. Bentz - E.J Bentz & Associates, Inc.
File Attachment
1601.PDF1.92 MB
Abstract
In the early days of development of commercial nuclear power reactors in the U.S., the overall length and uranium loading of the fuel assemblies were considerably less than those of later generation facilities. In turn, some of these early facilities were designed for handling shorter casks than currently-certified casks. The spent fuel assemblies from these facilities are nearly all standard fuel within the definition in the Standard Contract (10 CFR 961) between the utilities and the U.S. Department of Energy (DOE) (the Big Rock Point fuel cross-section is outside the standard fuel dimension), and the utilities involved hold early delivery rights under DOE's oldest-fuel-first (OFF) allocation scenario. However, development of casks suitable for satisfying the acceptance and transportation requirements of some of these facilities is not currently underway in the DOE Cask System Development Program (CSDP). While the total MTU of these fuels is relatively small compared to the total program, the number of assemblies to be transported is significant, especially in the early years of operation according to the OFF allocation scenario. We therefore perceive a need for DOE to develop an approach and to implement plans to satisfy the unique acceptance and transportation requirements of these facilities. One such approach is outlined below.