Design/Licensing of On-site Package for Core Component

Year
1992
Author(s)
T. Chohzuka - Tohoku Electric Power Co., Inc.
T. Shimura - Hitachi, Ltd.
T. Kikuchi - Hitachi, Ltd.
R. Fujiwara - Hitachi, Ltd.
S. Karigome - Transnuclear, Ltd., Japan
M. Takani - Transnuclear, Ltd., Japan
K. Ogasawara - Tohoku Electric Power Co., Inc.
File Attachment
1382.PDF1.47 MB
Abstract
For storage of used core components which are produced from reactors, Tohoku EPCO decided to construct a site bunker at Onagawa site. It was also decided to develop and fabricate one packaging to transport core components from the reactor buildings to the site bunker. The packaging will be used within the power station; therefore, it shall comply with \"The Law for the Business of Electric Power\" and relevant Notification. The main requirements of the packaging are as follows 1) The number of contents, such as channel boxes and control rods, shall be as large as possible. 2) The weight and the outer dimensions of the packaging shall be within the limitation of the reactor building and the site bunker. 3) Materials shall be selected from those which have been already applied for existing packagings and utilized without any problems. 4) It shall be considered during design of trunnions that handling equipment, such as lifting beam, can be used for not only this packaging but also for existing spent fuel packagings. The design of the packaging is completed and has been licensed. The packaging is scheduled to be utilized from November, 1993.