PRA-Code Upgrade to Handle a Generic Problem

Year
1999
Author(s)
James R. Wilson - Idaho National Engineering & Environmental Lab
Abstract
During the probabilistic risk assessment (PRA) for the proposed Yucca Mountain Nuclear waste repository, a problem came up that could not be handled by most PRA computer codes. This problem deals with dependencies between sequential events in time. Two similar scenarios that illustrate this problem are LOOP nonrecovery and sequential wearout failures with units of time. The purpose of this paper is twofold: To explain the problem generically, and to show how the PRA code at the INEEL, SAPHIRE, has been modified to solve this problem correctly.